Menu
Log in




























  The Australasian Society for Trenchless Technology

MEMBERS SITE

Log in

ASTT Webinar Number 12.

  • 23 Sep 2021
  • 1:00 PM - 2:00 PM (AEST)
  • Zoom

ASTT Webinar Number 12.

The ASTT is thrilled to be able to continue on with its webinars in 2021 and once again provide this FREE webinar in lieu of our popular trenchless forums which are presently suspended due to the Coronavirus restrictions.

The webinar will be a joint presentation by Stephen Grace and Chris McCarthny both from Watercare Services, New Zealand. The webinar is entitled " Building the Central Interceptor – Microtunnelling of the Link Sewers” and will be held on Thursday 23 September at 13:00pm (Eastern Standard Time) and concluding at 14:00pm

Abstract of Presentation
Stephen & Chris will describe the project design and delivery of this major infrastructure, and a progress report on the construction of the 2.1-2.4m link sewers by micro-tunnelling methods. 

The Central Interceptor is a new deep tunnel sewer that will provide additional capacity in the network to meet planned population growth and development in Auckland, provide a more resilient wastewater system, and mitigate wet weather overflows in central Auckland. The project is an integral part of Watercare’s long-term strategy to effectively manage wastewater within the Auckland region, to protect public health and the environment, and to provide for growth.

The Central Interceptor tunnel is to be built between Grey Lynn and the Mangere Wastewater Treatment Plant (WWTP) over the next five years. The main tunnel will be approximately 14.6 kilometres long and up to 110 metres below the ground surface. It will cross under the Manukau Harbour approximately 15 metres below the seabed. The main tunnel will be excavated by tunnel boring machine and will have an internal diameter of 4.5 metres. In addition, two separate link sewer tunnels ranging from 2.0 to 2.5 metres internal diameter and 1.1 to 3.2 kilometres in length respectively will be constructed by pipe jacking. Additionally there are 16 shafts and connecting sewers up to 78m deep that will divert flow into the tunnel.

You are invited to a Zoom webinar. Click on the link under to join this webinar:

https://us02web.zoom.us/j/82913617021?pwd=TVcvWW1vR2U0TG11L1hCdWNnOWpEZz09

If you experience difficulties in joining this free event, then please email Jeff Pace, ASTT Secretary on secretary@astt.com.au for assistance.
As an online attendee, you will be able to attend the webinar from anywhere and will be able to submit questions that will be answered at the end of the presentation.

We from the ASTT hope you can join us on 23 September 2021.

Jeff Pace
ASTT Secretary


Address: P.O. Box 2242, MALAGA LPO WA 6944

Email: secretary@astt.com.au

Powered by Wild Apricot Membership Software